Jack Walker and Paul Atzemis discuss the many factors of secondary containment design and the construction of coating systems for secondary containment.
- 0:00 – Intro and the AER Podcast
 - https://air-equipment.com/podcast
 - 2:38 – Secondary containment coating systems
 - 3:15 – EPA Spill Prevention, Control, and Countermeasure (SPCC) Guidance for Regional Inspectors – Chapter 4
 - https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/spill-prevention-control-and-countermeasure-6
 - 4:48 – Goal of Secondary containment systems
 - 4:56 – Secondary containment design considerations
 - 5:16 – Treatment of expansion joints, cold joints, cracks, pipe penetrations, and more with elastomeric coatings
 - 6:12 – Vehicular traffic in secondary containment areas
 - 7:40 – Slope away from primary containment
 - 8:31 – How big does the secondary containment area have to be?
 - 10:11 – The secondary design has to account for rainfall
 - 11:07 – The 72-hour rule
 - 12:40 – Coating system design for secondary containment
 - 15:05 – Neat coating systems for secondary containment
 - 16:41 – Aggregate-filled coating systems for secondary containment
 - 18:08 – Aggregate-reinforced coating systems for secondary containment
 - 20:00 – Wrap up
 